According to TEPCO (Tokyo Electric Power Company), a new power line will hopefully be ready by the afternoon of the 17th (Japanese Local Time) which will enable large pumps to be utilized to cool the reactor cores. This will also workers to work at nighttime, as well as reenabling the use of built in instruments such as water level meters and pressure sensors.
Read more here
No comments:
Post a Comment